Analysis
- Contract Value£600 K
- Principal ContractorMorgan EST
- ClientSevern Trent Water Authority
- Contract Duration20 Weeks
- Supervising OfficerMorgan EST
Summary
The project involved the fabrication and installation of stainless steel pipework systems upto 450mm diameter for the gas recovery from the sewage digester storage tanks the CHP and boiler heat recovery pipework. The installation utilised TIG welding on site and off site fabrication methods. The installation also required the use of a portable tower crane.
)
)
)
)